NEC 701.12 · Commercial

Legally required standby power sources

When normal power fails, a legally required standby system must pick up its loads within the time the application needs, and never more than 60 seconds. The code lists which power sources may supply it, from generators to a separate service.

What the code requires

Section 701.12 covers the power sources for legally required standby systems. If the normal supply fails, standby power must be available within the time the application requires, and never more than 60 seconds later. The supply can be one or more of the system types listed in 701.12(A) through (I), in addition to the normal service.

The source has to suit the job. Under 701.12(A), it is chosen based on whether the loads need short-time or long-duration service. Under 701.12(B), the equipment must be located or designed, or both, to reduce the chance of complete failure from floods, fires, icing and vandalism. How long the supply must last is covered in 701.12(C).

A generator approved by your inspector is allowed under 701.12(D)(1) if it is sized under 701.4 and can start automatically when normal power is lost. An outdoor generator with a readily accessible disconnect within sight of the building does not need a second disconnect at the building. If its conductors end at a disconnect in or on the building, that disconnect must meet 225.36.

Under 701.12(F), a separate service may be used where your inspector approves it. It needs separate service drops or laterals that are electrically and physically remote from the other service conductors.

On the job

  • Expect your inspector to confirm that standby power picks up the loads within 60 seconds of losing normal power.
  • The source is sized under 701.4, using the Article 220 Parts I–IV load calculation or another approved method.
  • Standby equipment must be located or designed, or both, so that floods, fire, icing and vandalism are less likely to take it out, as 701.12(B) requires.

What changed in 2023

The 2023 NEC reorganized 701.12 along the same lines as 700.12, including supply duration and microgrids; under 701.12(H), designated on-site standby sources may connect to a microgrid if the system isolates the legally required standby system from all other loads when normal power is lost, or meets 701.4(C).

In California

In the 2025 CEC, HCD (the state housing agency) adopted Chapter 7 except Articles 701 and 760, so ask your building department which rules apply to your building.

Related sections

Where this comes from

0/300

Answers come from this library only and are written by AI. They can be wrong, so check the cited section and confirm with your building department.

San Clemente · South OC to North County San Diego

Send a photo. Get a real answer.

Text is fastest, and a photo quote is free. Call if it is urgent, if you smell something burning, or if a breaker will not reset.

CSLB #354550 · C-10 Electrical · Licensed since 1978 · $25,000 contractor's bond