CK Electric and Sons · Since 1978
CSLB #354550 · C-10 Electrical
(949) 702-0385
ServicesEV chargersFree toolsWorkService areasAboutContact

CSLB #354550 · C-10 Electrical · Licensed since 1978 · $25,000 contractor's bond

Warm evening kitchen with three glowing seeded-glass pendants over a white quartz island, brass swing-arm wall sconces, recessed downlights and LED strips under floating shelves
Mission Viejo · serving South Orange County

The same family has been wiring this county since 1978.

CK Electric and Sons is a father-and-son C-10 electrical contractor. Clyde has held the license for 48 years. Shane runs the work. You get a licensed electrician who answers his own phone and explains what he’s doing. Photo quotes by text are free.

CSLB #354550 · C-10 ElectricalLicensed since 1978$25,000 contractor's bondResidential & commercial
1978
Year the C-10 license was issued. Still current and active.
2
Generations on the truck. Clyde qualified it, Shane runs it.
C-10
The only CSLB classification that legally covers electrical work.
Same day
Texted photos usually get a real answer back the same day — from Shane, not a call center.
What we do

Panel to plug, and everything on the wire between.

Residential and light commercial electrical across South Orange County. Remodels, retrofits, service calls, and the troubleshooting other electricians gave up on.

Most requested

EV charger installation

Tesla Wall Connector, NACS and J1772. Load calculation first, then a dedicated circuit sized right. Two cars on one service without tripping the main.

Panel upgrades & sub-panels

100A to 200A service upgrades — often step one for an EV charger, solar or a battery — plus sub-panels for garages, shops and ADUs, and replacement of the panels insurers flag.

Solar-ready panels & battery backup

The electrical side of solar: panel capacity, main-breaker derates, battery and generator hookups — done alongside the solar installer, not after.

Recessed & interior lighting

Layout, cut-in and trim-out. Dimmers that actually match the fixtures so nothing buzzes or flickers at 20 percent.

Rewires & remodel electrical

Whole-home and room-by-room rewires, rough-in through trim-out on remodels, and clean coordination with your GC and inspector.

Outlets, switches & dimmers

Adding circuits, GFCI and AFCI corrections, USB-C receptacles, and smart switches wired with a neutral so they work the way the app promised.

Ceiling fans & bath fans

Fan-rated boxes, bracing, and exhaust fans ducted to the outside instead of into the attic. Quiet units, correct CFM for the room.

Garage: openers, lighting, power

Dedicated opener circuits, ceiling receptacles, LED retrofits, and the MyQ-ready wiring a new LiftMaster head unit wants.

Hardwired cameras & doorbells

Ring, Nest and PoE cameras run on real wire instead of batteries, with a transformer that holds voltage and no drilling through your stucco twice.

Troubleshooting & code corrections

The dead circuit nobody could find, the breaker that trips at 6pm, the inspection correction list. Diagnosis first, then a price.

Commercial & tenant improvements

Panelboards and switchboards, EMT runs, lighting controls, EV stations and equipment hookups for shops, offices and multi-unit buildings.

EV chargers · solar · batteries

Adding an EV charger or solar? It starts at the panel.

Both put a big new load, or a new power source, on the panel. Before anything gets mounted on a wall or a roof, the panel and the service feeding it have to be able to take it. That’s the part we do first.

EV chargers

A 48-amp Wall Connector needs a 60-amp circuit, because chargers are sized at 125% of what they draw. We run the load calculation first, then tell you if the panel carries it, if load management gets you there, or if the service needs an upgrade.

EV charger calculator →

Solar & batteries

A 200-amp panel with a 200-amp main can back-feed about 7.7 kW of inverter output under the 120% rule. Bigger systems need a main-breaker derate, a supply-side connection or a new panel. We’re trained with an emphasis on solar, and we work alongside a dedicated solar installer: they do the array, we make sure the panel can take it.

Solar panel capacity checker →
  • Load calculation on your actual panel before anything is quoted
  • 100A to 200A service upgrades, coordinated with SDG&E or SCE
  • Main-breaker derates, sub-panels and load management when they’re the cheaper fix
New residential breaker panel with the cover off, cables formed neatly around both sides and landed on two columns of breakers
New panel, conductors dressed and landed
SolarEdge inverter, utility meter, AC disconnect and main panel mounted on a gray stucco wall of a house
Solar inverter, meter and AC disconnect on a house
The one everybody calls about

Two cars. One panel. No tripped main.

Most South County garages were wired long before anyone parked an EV in them. The honest answer is not “yes, we’ll add a 60-amp circuit” — it is a load calculation, then a plan.

  • Load calculation on your actual panel before anything is quoted
  • Tesla Wall Connectors that power-share so two cars run on one circuit
  • NACS, J1772 and any hardwired unit — we install what you bought
  • Permit pulled and inspection handled when the city requires one
  • If the panel needs upgrading first, you hear that up front, not after demo
Text a photo of your panel
White Tesla Wall Connector mounted on a wall with its charging cable coiled around it and the green status light on
Tesla Wall Connector installed, status light on
From the field

Straight off Shane’s phone.

No staging. Panels with the dead-front off, conduit mid-run, chargers the day they went live. Real jobs Shane has worked, residential and commercial, across Southern California.

Tall commercial panelboard with blue doors open, rows of breakers down the center and branch wiring neatly bundled along both guttersCommercial
Commercial panel upgrade, wiring dressed and landed
Parallel runs of EMT conduit with matched bends crossing a steel roof deck and dropping down a block wall into junction boxesCommercial
Parallel EMT runs bent and strapped on a steel deck
Three gray commercial panelboards with doors open and a tall enclosure, fed by parallel EMT conduit running along a block wallCommercial
Three panelboards fed in EMT along a block wall
Lighting control relay panel with a control board on the left and a column of numbered relays wired with color-coded conductorsControls
Lighting control relay panel, every relay labeled
Gray Kohler automatic transfer switch mounted on a wall between a fire alarm panel and a distribution panel, all fed in EMTBackup power
Generator automatic transfer switch beside the distribution
SolarEdge inverter, utility meter, AC disconnect and main panel mounted on a gray stucco wall of a houseSolar
Solar inverter, meter and AC disconnect on a house
Gray multi-unit meter stack in a utility room with three meters set and unit labels written on the coversService
Meter stack for a multi-unit building
A small house with two new meter sockets on the wall, a ladder against the roof and an electrician working at the service mastService
Service upgrade underway, new meter sockets set

See all 38 field photos →

The finished side

The rooms people remember are wired for it.

Layered lighting on dimmers, a backlit mirror, pendants hung at the right height over the island. It all needs a box in the right place, the right driver and a dimmer that matches, decided before the drywall goes up.

Planning a room? Lay out your recessed lights or plan your kitchen circuits.

Why this truck and not another one

A license is the floor. This is the rest.

48 years of the same license

CSLB #354550 was issued in March 1978 and has been active ever since. You can look it up in ten seconds, and you should — for every contractor you hire.

You talk to the person doing the work

No dispatcher, no upsell script, no "technician" who has to call the office for pricing. Shane picks up, Shane shows up, Shane does it.

Trade work that gets rehired

A licensed general contractor used CK Electric and Sons across a whole-home remodel — rough-in, trim-out, inspection — and keeps calling back. Trade work holds up to a different level of scrutiny than a service call.

Diagnosis before dollars

We find out what is actually wrong first. A price on a guess is how a $300 problem turns into a $3,000 one.

Clean work you will never see

Wire secured, boxes flush, panel labeled and legible. The parts behind the drywall are the parts that tell you who was in there.

If it isn't right, we come back

Straightforward, and at no charge. You should not have to negotiate with an electrician about a switch that stopped working two weeks later.

How a job runs

Four steps, no surprises.

STEP 01

Text or call

A photo of the panel, the fixture, or the burn mark tells us more than a paragraph. Fastest way to get a real answer.

STEP 02

Look at it

Small jobs get priced over text. Anything real gets a walk-through, because quoting electrical sight-unseen is how people get burned.

STEP 03

Written number

Line-item pricing — material and labor separated, so you can see exactly what you are paying for and what is optional.

STEP 04

Do it and clean up

Permit pulled if the work needs one, panel labeled, drywall dust vacuumed, and photos of anything now buried in a wall.

Where we work

Based in Mission Viejo. All over South County.

Home base is Mission Viejo, and most weeks the truck is somewhere between the 5 and the coast. If your town is not on this list, ask anyway.

Two names on one license

C.K. is a person.

Clyde Kent Farmer took out California electrical license #354550 in March of 1978. He’s the C.K. in the name. 48 years later that license is still current, still active, and still his.

Shane grew up around the trade, hearing about the jobs and watching how seriously his dad took the work. Clyde always wanted a family company he could pass down. Today Shane runs the work: remodels, service calls, EV chargers, panels, solar-ready upgrades and the troubleshooting nobody else wanted.

“My dad spent 50 years building the foundation. Now I get to help carry it forward, and I think that’s pretty cool.”

— Shane Farmer

Read the whole story →

License holder
Clyde Kent Farmer
On the tools
Shane Farmer
CSLB license
#354550 · C-10
Issued
March 23, 1978
What people say

Built on referrals.

“We used CK Electric and Sons across a whole-home remodel — rough-in, panel work, lighting, trim-out. Shane prices honestly, itemizes his bids, and the work passes inspection without a list. I hire a lot of subs. He is one of the few I do not have to check behind.”

Blake Lundquist
Lundquist Built Inc. · Licensed general contractor · San Clemente
Straight answers

Questions we get every week.

Is the license for real?

C-10 license #354550, issued in March 1978 and still active — you can look it up at cslb.ca.gov in about ten seconds, and you should. There's a $25,000 contractor's bond behind it too.

What does it cost to ask?

Nothing. Text a photo of the panel or the problem and small jobs usually come back with a real number the same day. When a job needs on-site diagnosis, that gets quoted up front and credits toward the repair.

Two EVs, one garage — can it work?

Often, and often without a service upgrade. Power-sharing chargers and an honest load calculation solve most South County garages; when the panel really is the limit, you hear that first, with numbers.

Who shows up at the door?

Shane — the same person you texted and the same person who priced it. Clyde comes along when an old house calls for a second pair of eyes.

More questions and answers →

Mission Viejo · South Orange County

Send a photo. Get a real answer.

Text is fastest, and a photo quote is free. Call if it is urgent, if you smell something burning, or if a breaker will not reset.

CSLB #354550 · C-10 Electrical · Licensed since 1978 · $25,000 contractor's bond