Free tool · Permits & hiring

Electrical permit checker for South Orange County

In all ten South Orange County communities, a new circuit, EV charger, panel upgrade, solar, battery or generator needs an electrical permit. Only a short list is exempt: replacing a receptacle or a same-size breaker in the same spot, and wiring under 25 volts and 50 watts, such as a doorbell (Dana Point’s list leaves that one out).

No sign-up · works on your phoneUpdated 30 sources

Your city and the job

Ladera Ranch and Coto de Caza aren’t cities, so the County of Orange issues their permits.
“Same spot” means the same kind of device, in the same box, on the same circuit.

The answer

Mission Viejo · EV charger on a new circuit
Permit required
Issued by the City of Mission Viejo
WhyNo exempt-work list we found covers a new circuit for a charger, so it needs a permit. Those lists only cover repairs and a few same-spot swaps.
Permits issued by
City of Mission Viejo
Online portal
Client Self Service
EV charger checklist (AB 1236)
Yes, published
SolarAPP+
Yes
  • The City of Mission Viejo publishes an EV charger permit checklist, part of the streamlined process state law (AB 1236, Gov. Code 65850.7) requires. It’s linked in the details with this answer.
  • AB 970 put clocks on small jobs (1 to 25 chargers): the application is deemed complete after 5 business days and deemed approved 20 business days after it’s complete. Under AB 1236 the permit office can’t make HOA approval a condition of the permit.
  • Unpermitted work tends to surface later. California’s seller disclosure form (the TDS) asks whether any alterations or repairs were made without necessary permits, and a home inspector or an insurance claim can raise the same question.
  • On a hired job, the licensed contractor normally pulls the permit. CSLB’s homeowner checklist says the contract should require the contractor to get any needed permits before work starts. Sign the permit yourself as an owner-builder and CSLB says you take on full responsibility for the job.
  • “Exempt from a permit” isn’t “exempt from code”. The work still has to meet code, and it doesn’t make panel or line-voltage work a DIY job.

Based on: San Juan Capistrano — Work Exempt from Permit (2025 CRC R105.2 list) · GO-Biz — EV charger permit streamlining (AB 1236 / AB 970) fact sheet · CSLB — Home improvement contracts: homeowner checklists · CSLB — Owner-builder responsibilities · C.A.R. Real Estate Transfer Disclosure Statement (TDS rev. 6/23)

Built from each department’s published pages as of September 22, 2026. The building official decides what needs a permit, and cities change their lists, so a quick call or email to the counter is the final word.

Worked example

An EV charger in Ladera Ranch, and a light switch in two cities

Ladera Ranch, new EV charger circuit. Ladera Ranch isn’t a city, so the permit comes from the County of Orange, through OC Development Services, Building & Safety (OC Public Works). The answer is Permit required: a new circuit isn’t on any exempt list. The County has had a streamlined EV charger ordinance (No. 16-018) since 2016, and state law puts clocks on it: for 1 to 25 chargers, the application is deemed complete after 5 business days and deemed approved 20 business days after that. An HOA can have its own rules, but the County can’t make HOA approval a condition of the permit.

Replacing a light switch. In San Clemente the answer is Usually exempt (like-for-like replacement), because the city’s own list names “Replacement of general use snap switches.” In Mission Viejo it’s Ask the city. The city hasn’t published its own list that we found, and the model list in the California Residential Code (R105.2) exempts “minor repair work” without naming switches. When a list doesn’t name the job, the tool says “ask” rather than guess.

Reference

Every city, every job

Who issues the permit in each place, where to apply online, whether the department publishes an EV charger checklist (required by AB 1236, Gov. Code 65850.7) and whether it’s on the SolarAPP+ list. Then every job, with the places where the answer changes. Checked against each department’s own pages on September 22, 2026.

Who issues electrical permits in South Orange County. EV charger checklists (AB 1236) and SolarAPP+ by permit office, checked 9/22/2026. Place Mission Viejo: Permit office City of Mission Viejo: EV checklist Yes: SolarAPP+ Yes; Place San Clemente: Permit office City of San Clemente: EV checklist Yes: SolarAPP+ Yes; Place Dana Point: Permit office City of Dana Point: EV checklist Not found: SolarAPP+ No (Symbium); Pla
Who issues electrical permits in South Orange County
Electrical jobs and whether they need a permit
JobAnswerWhere it differsBasis
EV charger on a new circuitPermit requiredSame in all tenNew circuit; not on any exempt list. Streamlined by AB 1236 / AB 970.
Panel or service upgrade / panel changePermit requiredSame in all tenNot on any exempt list; the utility is involved too.
New circuit (any size)Permit requiredSame in all tenNot on any exempt list.
Add a receptacle or switch where there wasn’t onePermit requiredSame in all tenThe receptacle exemption excludes “the outlets therefor”.
Sub-panel (garage, ADU, shop)Permit requiredSame in all tenNot on any exempt list.
Replace a receptacle, same spot (like-for-like)Usually exemptSame in all tenEvery list exempts reinstalling or replacing attachment plug receptacles.
Replace a switch or dimmer, same spotAsk the city in 9 of 10Usually exempt in San ClementeOnly San Clemente’s list names snap switches.
Replace a breaker, same size and spotUsually exemptSame in all tenEvery list exempts same-capacity overcurrent devices in the same location.
Replace a light fixture in the same boxAsk the citySame in all ten“Replacement of lamps” means bulbs; no list names fixtures.
Add recessed lightsPermit requiredSame in all tenNew lighting outlets; not on any exempt list.
Ceiling fan in place of a lightAsk the citySame in all tenBox must be listed for fan support (NEC 314.27(C)); no list names fans.
Rooftop solarPermit requiredSame in all tenNot on any exempt list; SB 379 automated permits (SolarAPP+ or Symbium).
Home batteryPermit requiredSame in all tenNot on any exempt list.
Standby generator or transfer switchPermit requiredSame in all tenPermanent wiring; not on any exempt list.
Whole-house rewirePermit requiredSame in all tenNot on any exempt list.
Hot tub or spaPermit requiredSame in all tenNot on any exempt list.
Kitchen or bath remodel electricalPermit requiredSame in all tenNot on any exempt list.
Low-voltage doorbell or chime wiringUsually exempt in 9 of 10Ask the city in Dana PointModel list exempts under 25 V and 50 W; Dana Point’s list leaves that out.
Hardwired PoE cameras / network cableAsk the city in 9 of 10Usually exempt in San ClementeOnly San Clemente names Class II/III circuits; Dana Point exempts communications wiring.

“Not found” means we didn’t find it on the department’s site, not that it doesn’t exist. Dana Point and San Juan Capistrano meet the state’s automated solar permit law (SB 379) with Symbium instead of SolarAPP+.

How to use it

In 4 steps

  1. Pick where the house is. Ladera Ranch and Coto de Caza are unincorporated, so they go to the County of Orange.
  2. Pick the job. “Same spot” means the same kind of device in the same box on the same circuit.
  3. Read the answer and the reason, which quotes the exempt list it came from.
  4. Use the department and portal links. For anything marked “Ask the city”, a one-line email to the permit counter settles it.
The why

Why most electrical work needs a permit here

Permits are the default and exemptions are a short, specific list. The model list sits in the California Residential Code, section R105.2, and it has five electrical items: temporary decorative lighting, reinstalling receptacles, replacing a breaker of the same size in the same spot, wiring under 25 volts and 50 watts, and minor repairs such as changing a lamp. Everything else, from a new circuit to a panel, is permitted work.

Cities can publish their own version. San Clemente’s is broader (it names switches, Class II and III low-energy circuits and portable generators). Dana Point’s 2025 handout is narrower, with four electrical items and no under-25-volt line. San Juan Capistrano and Rancho Santa Margarita post the model list as is.

Two state laws speed up the permits you’re most likely to need. AB 1236 requires every city and county to run a streamlined EV charger permit with a published checklist, and SB 379 requires an instant online permit for home solar up to 38.4 kW AC (SolarAPP+ or an equivalent). Neither one removes the permit. On a hired job the contractor pulls it, and we pull the permit on the EV chargers and panel upgrades we install. The code behind the inspection is the 2025 California Electrical Code (the 2023 NEC), in effect since January 1, 2026, and your inspector has the final word.

Questions

Permit checker: common questions

Do I need a permit to install an EV charger in South Orange County?

Yes, in all ten communities. A charger on a new circuit isn’t on any exempt list. Every permit office here except Dana Point (where we didn’t find one) publishes an EV charger checklist, and state law (AB 970) deems a 1-to-25-charger application complete after 5 business days and approved 20 business days after that.

Who pulls the electrical permit, me or the electrician?

On a hired job, the licensed contractor normally pulls it, and CSLB tells homeowners to make sure the contract says so. If a contractor asks you to take the permit out yourself as an owner-builder, say no: CSLB says signing as an owner-builder means you assume full responsibility for the project.

Can I replace a light fixture without a permit?

Ask your city. The model exempt list covers “replacement of lamps”, meaning bulbs, and “minor repair work”. Many departments treat a same-box fixture swap as minor repair, but none of the lists we read names fixtures, and Dana Point’s list doesn’t include minor repair at all.

Who issues permits in Ladera Ranch and Coto de Caza?

The County of Orange. Both are unincorporated, so permits come from OC Development Services (part of OC Public Works), and you apply through the County’s myOCeServices portal. The County is on the SolarAPP+ list and publishes EV charger submittal requirements.

What happens if electrical work was done without a permit?

It tends to come up when you sell. California’s Transfer Disclosure Statement asks the seller about alterations or repairs made without necessary permits, and a buyer’s inspector may flag the work too. Your city’s building department is where legalizing it starts.

Does my city use SolarAPP+ for solar permits?

Seven of the nine permit offices here do: Aliso Viejo, Laguna Niguel, Lake Forest, Mission Viejo, Rancho Santa Margarita, San Clemente and the County of Orange. Dana Point and San Juan Capistrano use Symbium to meet SB 379 instead.

Sources

Where these numbers come from

  1. San Juan Capistrano — Work Exempt from PermitThe five electrical items on the 2025 California Residential Code R105.2 exempt list, quoted verbatim, and the line that exempt work must still meet code (read Sep 22, 2026).
  2. Rancho Santa Margarita — Permit ExceptionsThe same five electrical exemptions, cited as 2025 CBC 105.2 (read Sep 22, 2026).
  3. San Clemente — Permits (Municipal Code 17.04.032)San Clemente’s own exempt list, including “Replacement of general use snap switches” and Class II/III low-energy circuits; eTRAKiT portal; SolarAPP+ statement (read Sep 22, 2026).
  4. Dana Point — B107 Work Exempt from Building Permits (2025)Dana Point’s four electrical exemptions: decorative lighting, reinstalling receptacles, same-size overcurrent devices, communications wiring (read Sep 22, 2026).
  5. Dana Point — Solar PermitDana Point uses Symbium for SB 379 automated solar permits; eTRAKiT portal (read Sep 22, 2026).
  6. Dana Point — Building & Safety Applications & HandoutsChecked for an EV charger permit checklist; none listed (read Sep 22, 2026).
  7. Mission Viejo — Building Services and SolarAPP+SolarAPP+ projects are submitted through Client Self Service; Building Services page and portal link (read Sep 22, 2026).
  8. Mission Viejo — EVCS ChecklistThe city’s published EV charging station checklist (read Sep 22, 2026).
  9. San Clemente — EV Checklist (PDF)“Residential and Non-Residential Checklist for Permitting Electric Vehicles and EVSE” (read Sep 22, 2026).
  10. San Juan Capistrano — Solar PV & EV Charging StationsExpedited EVCS eligibility checklists; Symbium for SB 379 solar permits (read Sep 22, 2026).
  11. Laguna Niguel — SolarAPP+SolarAPP+ confirmed; Building & Safety page and Online Permit Center link (read Sep 22, 2026).
  12. Laguna Niguel — Form 140, EV Charging Station Permitting Form and ChecklistExpedited EV charger permitting checklist (read Sep 22, 2026).
  13. Rancho Santa Margarita — Building & Safety and Forms & HandoutsElectric Vehicle Service Equipment Checklist; RSM Permit Center (CTS.City); SolarAPP+ submittal page (read Sep 22, 2026).
  14. Aliso Viejo — Solar PermitsSolarAPP+ “Instant Solar Permit”; online permit portal link (read Sep 22, 2026).
  15. Aliso Viejo — EV charging guidelines for residential buildingsThe city’s residential EV charger permit guideline; a non-residential checklist is also posted (read Sep 22, 2026).
  16. Lake Forest — Building PermitseLakeForest portal and the “EVSE Checklist AB 1236” (read Sep 22, 2026).
  17. Lake Forest — SolarAPP+ Automated Solar Plan ReviewSolarAPP+ confirmed (read Sep 22, 2026).
  18. County of Orange — OC Development Services, Building Permit InformationPlan check and permits for private property in unincorporated Orange County; myOCeServices (read Sep 22, 2026).
  19. County of Orange — EV ChargingAB 1236 deadline of September 30, 2017; County Ordinance 16-018; EVCS submittal requirements and residential guidelines (read Sep 22, 2026).
  20. County of Orange — Solar PVThe County adopted SolarAPP+ (read Sep 22, 2026).
  21. OC LAFCO — South Orange County unincorporated communitiesCoto de Caza and Ladera Ranch listed as unincorporated communities (read Sep 22, 2026).
  22. SolarAPP+ — Where is SolarAPP+ availableAdopting-jurisdiction list: Aliso Viejo, Laguna Niguel, Lake Forest, Mission Viejo, Orange County, Rancho Santa Margarita and San Clemente are on it; Dana Point and San Juan Capistrano aren’t (read Sep 22, 2026).
  23. California Energy Commission — SB 379 residential solar permittingPopulation thresholds, the September 30, 2023 and September 30, 2024 deadlines, and the 38.4 kW AC system limit (read Sep 22, 2026).
  24. GO-Biz — EV Charger Permit Streamlining (AB 1236 / AB 970) fact sheetChecklist, administrative approval and no-HOA-approval rules (Gov. Code 65850.7); AB 970 clocks of 5 and 20 business days for 1–25 chargers (read Sep 22, 2026).
  25. EC&M — Code Q&A: support requirements for ceiling-suspended fansNEC 314.27(C): a box that supports a paddle fan must be marked as suitable for fan support. The article discusses the 2017 NEC; the section number is the same in the 2023 edition California adopted (read Sep 22, 2026).
  26. CSLB — Home improvement contracts: homeowner checklists“Does the contract require the contractor get any needed permits before the work starts?” (read Sep 22, 2026).
  27. CSLB — Owner-builder responsibilitiesSigning a permit as owner-builder means assuming full responsibility for the project (read Sep 22, 2026).
  28. C.A.R. Real Estate Transfer Disclosure Statement (rev. 6/23)Item II.C.4 asks the seller about “alterations or repairs made without necessary permits” (read Sep 22, 2026).
  29. Riverside County Building & Safety — 2025 California Building Standards CodeThe 2025 California Building Standards Code took effect January 1, 2026 (read Sep 22, 2026).
  30. Building Standards Commission — 2025 CEC Initial Statement of Reasons (Part 3)The 2025 California Electrical Code adopts the 2023 NEC (read Sep 22, 2026).

Last reviewed . This tool is general information for planning, not a design or a permit document — your inspector and the code edition your city has adopted have the final word. Spot something wrong? Text Shane at (949) 702-0385 and it gets fixed.

Mission Viejo · South Orange County

Rather have a licensed electrician look at it?

Text Shane a photo of your panel or the problem. Photo quotes by text are free.

CSLB #354550 · C-10 Electrical · Licensed since 1978 · $25,000 contractor's bond