NEC 408.41 · Homes and commercial

One neutral per terminal in panels

In a panelboard, each grounded (neutral) conductor must land on its own terminal. Two neutrals under one screw is a common inspection correction, because disconnecting one can disconnect the other.

What the code requires

Each grounded conductor, usually called the neutral, must terminate in its own individual terminal in a panelboard. That way, removing one circuit's neutral cannot disconnect another circuit's neutral.

A neighboring rule, 408.40, keeps equipment grounding conductors off the terminal bar for grounded (neutral) conductors, unless the bar is identified for that purpose and is located where Article 250 permits or requires neutrals and equipment grounds to be connected, such as at service equipment or a separately derived system. A main bonding jumper is required where the panel is used as service equipment (408.3(C)).

On the job

  • Two neutrals under one screw is a common correction. Pulling one can disconnect the other, and on a multiwire branch circuit a lost neutral can cause over- and under-voltage on connected equipment.
  • In a subpanel, neutrals and equipment grounding conductors mixed on one bar is a common correction.

Exceptions that matter

  • Parallel neutral conductors may share one terminal if the terminal is identified for more than one conductor (110.14(A)).

Related sections

Where this comes from

0/300

Answers come from this library only and are written by AI. They can be wrong, so check the cited section and confirm with your building department.

San Clemente · South OC to North County San Diego

Send a photo. Get a real answer.

Text is fastest, and a photo quote is free. Call if it is urgent, if you smell something burning, or if a breaker will not reset.

CSLB #354550 · C-10 Electrical · Licensed since 1978 · $25,000 contractor's bond